Wednesday, 16 December 2009

To do list.....

Finish filming and editing
Finish Digipack, add two more images of the group.
Create a website.


To do shots.....
Corridor scene.
projection.
White wall
Black wall
Laying down shot with fabrication.
Walking towards the camera.
Correography
Camera moving shot, (multiple shot by using a DSLR camera).

Equipment needed
Projector
Assetate paper
insruments
Costumes
Fabric
Cameras
Triopod

With most of the equipment needed we already have or have easy access to so it shouldnt cause any problems with fliming.

No comments:

Post a Comment